Skip to main content
Loading…
This section is included in your selections.

As a condition of granting permission to a person seeking permission to connect to the water system, the Director may require that such person convey to the City an easement for water line purposes. The scope of the easement may be as broad as the Director determines is necessary to make such connection and to provide for a compatible present integration with the water system and its future expansion. (Ord. 88-23 §4, 1988).